Industrial equipment
Measure the pump unit with its base. Send its length, width, height and weight, plus a photo of the lifting points.
Add to enquiry ↗China ↔ Central Asia / Russia / Belarus
For freight forwarders in Kazakhstan, Uzbekistan, Kyrgyzstan, Russia and Belarus, and traders shipping to or from China. For steel, structural sections or machinery, send the loading and delivery addresses, cargo ready date, longest piece and heaviest piece.
For forwarders — check the rate scope · For traders — confirm delivery arrangements
View cargo and trailer types ↓
CARGO
Choose a cargo type to add it to your enquiry. Dimensions, securing and handling need to be checked before loading.

Measure the pump unit with its base. Send its length, width, height and weight, plus a photo of the lifting points.
Add to enquiry ↗
For beams, sections or bundled pipes, give the longest piece, bundle count, weight per bundle and unloading method.
Add to enquiry ↗
Measure mixers and tools as they will travel. State whether the wheeled frame stays attached or is packed separately.
Add to enquiry ↗
Is the machine crated or unpacked? Give the packed dimensions and gross weight per piece, and confirm whether it can travel on an open trailer.
Add to enquiry ↗
State whether the cabinet is empty or contains batteries. If batteries are fitted, provide the battery type and safety data sheet for acceptance and loading checks.
Add to enquiry ↗
For an excavator, provide its height with the boom folded, overall track width and weight. Confirm whether it can drive onto the trailer and whether the bucket travels separately.
Add to enquiry ↗ROUTES
Choose the country and direction, then enter the actual loading and delivery addresses. Routing, vehicle availability and acceptance are checked for each shipment.
Country listings show the markets covered by enquiries. Local offices and scheduled departures have not been confirmed.
Add to enquiry ↗TRAILER TYPES
Give dimensions, weight and support points for each piece. Total tonnage alone is not enough to choose a trailer. Lowbed and extendable trailer availability must be checked for the loading date.
Trailer layout illustration for reference.
Standard flatbed
Open loading for steel, pipes and structural sections. Check support points, weight distribution and lashing positions for each piece.

BEFORE LOADING
Confirm the load fits and the crane is booked before the truck reaches the factory.
Transport dimensions, piece count, total weight and weight per piece.
Check the deck, support points and securing plan against cargo photos and drawings.
Crane or forklift, access roads, loading slot and unloading arrangements.
Loading and delivery points, access restrictions and required documents.
CONTACT
Contact details are still pending. You can copy your enquiry or download it as a text file. The page does not send it.
Fleet name — to be provided
Phone / WeChat / WhatsApp — to be provided
Email — to be provided
Enquiry details are not sent to the fleet or stored on the server.
Select “To China” and the loading country. Include both addresses, piece count, dimensions, weight and cargo ready date. A return load needs a separate quote.
Check the packaging and protection plan first. An open trailer needs more than an instruction to cover the load. If rain and corrosion protection cannot be met, choose a suitable enclosed vehicle.
Check the written breakdown. Confirm freight, loading, unloading, transloading, customs brokerage, waiting and insurance separately before booking.
Send the actual route, transport dimensions, weights and piece count. For machinery, add photos, centre of gravity and lifting points so loading and securing can be checked.
No. Overall dimensions, route, handling and securing requirements also affect the rate.
These are enquiry markets. Vehicles, routing and acceptance are confirmed shipment by shipment.
Availability has not yet been confirmed. Include any special trailer requirements so they can be checked before arrangements are made.